Mason Pud 1 Click here for E-Bill

Water Rates

Revised January 1, 2012/Established 2000
ALL WATER SYSTEMS
AGATE BEACH
NON-METERED:
System Development Fee

$35.62 Flat Rate
$2696.26
ALDERBROOK GOLF COURSE:
METERED RATE:
PLUS FLAT MONTHLY RATE:

$ .83/100 cu. ft
$3063.13/month
ALDERBROOK RESIDENTIAL
METERED RATE:
 
First 400 cu. ft. or less
401 to 1000 cu. ft.
1001 cu. ft. & above
$29.90/month
1.41/100 cu. ft.
1.77/100 cu. ft.

System Development Fee

$3922.44
ALDERBROOK RESIDENTIAL LOTS
NON-METERED:

$ 7.24/month
*All Alderbrook water customers, having unconnected lots, were sent
a letter in October 2001. If they elected to pay the residential lot fee, their
future water connection fee will be $250.00. Any customer who
elected not to pay the monthly residential lot fee will be required to pay a
connection fee of $3922.44.
ALDERBROOK INN + 25
METERED RATE:
 

First 78000 gallons
78001 to 195000 gallons
195001 to 9999999 gallons

$4018.39/month
$       .001892/gallon
$       .002383/gallon
 
 
ARCADIA ESTATES
METERED RATE:
 

First 400 or less
401 to 1000 cu.ft.
1001 cu. ft. & above

Capital Surcharge:
System Development Fee:

$29.90
$1.41/100 cu. ft
$1.77/100 cu ft.

$11.00/month
$3655.52
 
BAYEAST
METERED RATE: 
 
First 400 cu. ft. or less $29.90/month
401 to 1000 cu. ft.
1001 cu. ft. & above

1.41/100 cu. ft.
1.77/100 cu. ft.

Capital Surcharge:
System Development Fee:

$13.00/month
$3910.59
BAYSHORE
METERED RATE:
 
METERED RATE GALLONS:
First 3000 gallons or less
3001 to 7500 gallons
7501 gallons & above

$29.90/month
$    .001892/gallon
$    .002383/gallon

METERED RATE -CUBIC FEET
First  400 cu. ft. or less
401 to 1000 cu. ft.
1001 cu. ft. & above

Capital Surcharge
System Development Fee:


$29.90/ month
   1.41/100 cu. ft.
   1.77/100 cu. ft.

$ 8.75/month
$3930.62

BLOOMFIELD
NON-METERED:


$35.62 Flat Rate
Capital Surcharge: $ 4.00/month
System Development Fee: $2640.71
 
CANAL MUTUAL
NON-METERED RATE:

Capital Surcharge :

$35.62 Flat Rate

$32.00/month
 

System Development Fee

$3586.09
CANAL BEACH TRACTS
METERED RATE:
First 400 cu. ft. or less
401 to 1000 cu. ft.
1001 cu. ft. & above

Capital Surcharge:



$29.90/month
1.41/100 cu ft.
1.77/100 cu ft.

$26.00/month
System Development Fee: $3199.17
 
CANYONWOOD BEACH
METERED RATE:
 

First 400 cu. ft. or less
401 to 1000 cu. ft.
1001 cu. ft. & above

System Development Fee

$29.90/month
1.41/100 cu. ft.
1.77/100 cu. ft.

$3209.94
CHERRY PARK
METERED RATE:
 

First 400 cu. ft. or less
401 to 1000 cu. ft.
1001 cu. ft. & above

Capital Surcharge:

System Development Fee:

$29.90/month
1.41/100 cu. ft.
1.77/100 cu. ft

$11.00/month

$3969.75

CRAIG
NON-METERED:

System Development Fee

CUSHMAN INC.
NON-METERED:


$35.62 Flat Rate

$4162.67


$35.62 Flat Rate

 

GLEN AYRE
METERED RATE:
First 3500 cu. ft. or less
3501-8800 cu. ft.
8801 cu. ft. & above

Capital Surcharge



$261.65/month
1.41/100 cu ft.
1.77/100 cu ft

$249.00/month
 
HARTSTENE RETREAT
METERED RATE:
 
First 400 cu. ft. or less
401 to 1000 cu. ft.
1001 cu. ft. & above
$29.90/month
1.41/100 cu. ft.
1.77/100 cu. ft.

System Development Fee

$7072.30
HIGHLAND ESTATES
METERED RATE:
 

First 400 cu. ft. or less
401 to 1000 cu. ft.
1001 cu. ft. & above

Capital Surcharge:

System Development Fee:

$29.90/month
1.41/100 cu. ft.
1.77/100 cu. ft.

$16.00/month

$3465.00
HIGHLAND PARK
METERED RATE:
 

First 400 cu. ft. or less
401 to 1000 cu. ft.
1001 cu. ft. & above

Capital Surcharge:

System Development Fee

$29.90/month
1.41/100 cu. ft.
1.77/100 cu. ft.

$7.00/month

$4027.37
HOOD CANAL
METERED RATE:
 

First 400 cu. ft. or less
401 to 1000 cu. ft.
1001 cu. ft. & above

Capital Surcharge

System Development Fee

$29.90/month
1.41/100 cu. ft.
1.77/100 cu. ft.

$27.00/month

$5932.93

HOOD CANAL
NON-METERED:

Capital Surcharge

System Development Fee


$35.62 Flat Rate

$27.00/month

$5932.93
HOODSPORT/SUNCREST
METERED RATE:
 
First 400 cu. ft. or less
401 to 1000 cu. ft.
1001 cu. ft. & above

Capital Surcharge:

System Development Fee
$29.90/month
1.41/100 cu. ft.
1.77/100 cu. ft.

$18.00/month

$4719.48

ISLAND HIDE-A-WAY
METERED RATE:

First 400 cu. ft. or less
401 to 1000 cu.ft.
1001 cu. ft. & above

 


$29.90/month
1.41/100 cu.ft.
1.77/100 cu.ft

 

LAKE ARROWHEAD
METERED RATE:

 

First 400 cu. ft. or less
401 to 1000 cu.ft.
1001 cu. ft. & above

Capital surcharge:

System Development Fee

$29.90/month
1.41/100 cu.ft.
1.77/100 cu.ft

$19.00

$3201.63

LAKEWOOD HEIGHTS
METERED RATE:
 
First 400 cu. ft. or less
401 to 1000 cu. ft.
1001 cu. ft. & above
$29.90/month
1.41/100 cu. ft.
1.77/100 cu. ft.

Capital Surcharge:

System Development Fee

$ 6.00/month

$3217.64
 

MADRONA BEACH
METERED RATE:
First 400 cu ft. or less
401 to 1000 cu. ft.
1001 cu. ft. & above

Capital Surcharge

System Development Fee



$29.90/month
$ 1.41/100 cu. ft
$ 1.77/100 cu.ft.

$21.00/month

$2388.20
MT VIEW
METERED RATE:
 
First 400 cu. ft. or less
401 to 1000 cu. ft.
1001 cu. ft. & above
$29.90/month
1.41/100 cu. ft.
1.77/100 cu. ft.

Capital Surcharge:

System Development Fee

$ 39.50/month

$4982.09
MINERVA TERRACE
METERED RATE:
 
First 400 cu. ft. or less
401 to 1000 cu. ft.
1001 cu. ft. & above
$29.90/month
1.41/100 cu. ft.
1.77/100 cu. ft.

System Development Fee

$2554.40

MINERVA TERRACE-NON RESIDENTIAL
NON-METERED:

System Development Fee

*This rate is for customers who are not connected to the
system. When these customers do connect there will be no development fee.


$20.75 Flat Rate


$-0- *
 
PIRATES COVE
METERED RATE:
 
First 400 cu. ft. or less
401 to 1000 cu. ft.
1001 cu. ft. & above
$29.90/month
1.41/100 cu. ft.
1.77/100 cu. ft.

Capital Surcharge

System Development Fee

$27.00/month

$3563.12
SOUTH SIDE
METERED RATE:
 

First 400 cu. ft. or less
401 to 1000 cu. ft.
1001 cu. ft. & above

$29.90/month
1.41/100 cu. ft.
1.77/100 cu. ft.
System Development Fee $2750.00
 
TIGER LAKE
METERED RATE-GALLONS:
 
First 3000 gallons or less $29.90/month
3001 to 7500 gallons
7501 gallons & above
.001892/gallon
.002383/gallon
 

Capital Surcharge

System Development Fee

$ 8.00/month

$4070.26
TIGER LAKE
METERED RATE-CUBIC FEET:
 
First 400 cu. ft. or less
401 to 1000 cu. ft.
1001 cu. ft. & above
$29.90/month
1.41/100 cu. ft.
1.77/100 cu. ft.

Capital Surcharge

System Development Fee

$ 8.00/month

$4070.26

TWANOH HEIGHTS
NON-METERED:

Capital Surcharge

System Development Fee


$35.62 Flat Rate

$ 5.60/month

$3576.21
 
TWANOH TERRACE
NON-METERED RATE

Capital Development Fee:

$35.62 Flat Rate

$2440.00
UNION
METERED RATE:

First 400 cu. ft. or less
401 to 1000 cu. ft.
1001 cu. ft. & above

 


$29.90/month
1.41/100 cu. ft.
1.77/100 cu. ft.

Capital Surcharge

System Development Fee

$ 9.00/month

$3676.59

UNION RIDGE
METERED RATE:
First 400 cu. ft. or less
401 to 1000 cu. ft.
1001 cu. ft & above

System Development Fee



$29.90/month
$1.41/100  cu. ft.
$1.77/100 cu.ft.

$2568.44
 
VIEW CREST BEACH
NON-METERED RATE:

System Development Fee


$35.62

$-0-
VIEW RIDGE HEIGHTS:
METERED RATE:

First 400 cu. ft. or less
401 to 1000 cu. ft.
1001 cu. ft. & above
 

 


$29.90/month
1.41/100 cu. ft.
1.77/100 cu. ft.

Capital Surcharge:

System Development Fee

$ 7.25/month

$3141.66

VUECREST
METERED RATE:
First 400 cu. ft. or less
1001 cu. ft. & above


System Development Fee


$29.90
1.41/100 cu. ft.
1.77/100 cu. ft.


$4011.42
 

WATSON
METERED RATE:

 
First 400 cu. ft. or less
401 to 1000 cu. ft.
1001 cu. ft. & above
$29.90/month
1.41/100 cu. ft.
1.77/100 cu. ft.
System Development Fee $2542.20
 

MADRONA BEACH SEWER (WITHOUT SYSTEM DEVELOPMENT FEE)
Basic Charge                         $25.10/month

MADRONA BEACH SEWER (WITH SYSTEM DEVELOPMENT FEE)
Basic Charge                         $25.10/month

Capital Surcharge                   $45.23/month

MISCELLANEOUS CUSTOMER CHARGES  

Service Set-up Charge

$ 15.00
SECURITY DEPOSITS-  

Owner/Non-Owner Residential
(Without Letter of Credit)

$100.00 OR
Two Month High-
whichever is greater
General Service Customers
(Without Letter of Credit)
$100.00 OR
Two Month High-
Whichever is greater
Prior Disconnect/Bad Credit History
Residential Customers
$200.00 OR
Two Month High-
Whichever is greater
Large Commercial
(Industry standard usage if not available)
Two month average high

Irrigation 2 month average high
(Industry standard usage if not available)

Two month average high
OTHER CHARGES  

Disconnect for Non-Payment
Or Field Service Call to Collect Monies

$ 25.00
Reconnect Service
During Working Hours
$ 15.00
Connect or Reconnect Service
During Non-Working Hours
$150.00
Disconnect and Reconnect
Within 1 Year
Basic Service Charge
For Each Month the Service is Disconnected
Plus Capital Surcharge
Disconnect and Reconnect
After 1 Year
1/2 half of the System
Development Fee
Late Charge on Unpaid Balance
Over 30 Days
1.5%

Bad Check Charge

$ 50.00
Meter Tampering (Breaking meter seal)
Plus reconnect fee
Reconnecting a Disconnected Service
after breaking meter seal
$100.00
$15.00

$125.00 plus usage
Water Diversion Plus Water Usage $1250.00 plus usage
(Estimated if necessary)

Check Customer Outages During
Non-Working Hours-Customer Problem

$ 150.00
No Charge if Utility Problem

Associated Service Charge, Fees,
Expenses From Local, State of
Federal Agencies

Actual Cost
Temporary Service (Installation/Removal) Actual Cost
Crew/Servicemen Standby
(Customer Request)
Actual Cost
Customers Damage to District's Property Actual Cost
Application/Estimate Fee
  * Minimum fee and /or actual costs
Review Fee For Developers
   * Includes administrative costs
$100.00*


Actual cost*

Hydrant Use
Use fee
Six-Month Permit
 


$ 100.00
$ 600.00
METER INSTALLATION FEES  
5/8-Inch or 3/4-Inch
1-Inch
1 1/2-Inch
2-Inch and Above
$ 451.33
$ 480.00
$ 875.00
Actual Cost

TOP OF PAGE

Conservation

Mason County
PUD No 1 offers
tips for water &
energy
conservation.

Electric conservation tips ›
Water conservation tips ›

Copyright 2007 Mason County Public Utility District No 1. Non-Discrimination Policy
21971 N. Highway 101 - Shelton (Potlatch), Washington 98584 • 360.877.5249 - 800.544.4223